Formation of DB Bahnbau Gruppe GmbH

Formation of DB Bahnbau Gruppe GmbH

DB Bahnbau Gruppe GmbH is the round-the-clock full service provider of rail infrastructure. The subsidiary of Deutsche Bahn came into being in 2010 through the merger of the companies DB Bahnbau GmbH, Deutsche Gleis- und Tiefbau GmbH, Deutsche Bahn Gleisbau GmbH, as well as Ibb – Ingenieur,- Brücken- und Tiefbau GmbH. MOS – Mobile Oberbau Schweißtechnik GmbH – had previously merged into the company.

Symbolischer Spatenstich mit Markus Egerer

Review

2010

The new DB Bahnbau Gruppe GmbH starts out with the service units Track Works, Technical Systems and General Contractor (Germany and International).

2011

The two service units "General Contractor" and "Track Works" replace the station throat at Oslo main station.

The "Track Works" team build on the Oebisfelde-Gardelegen route.

2012

Brücke wird saniert. Zug fährt oben drüber

Founding of the service unit Structural engineering with the organizational units Recycling, Dresden bridge workshop, and Special Construction. Construction completed on the Berlin-Cottbus route, in which all service units of DB Bahnbau Gruppe GmbH were involved.

2013

GU-Projekte

The service unit Prime Contractor Projects successfully sets up the Fürstenberg Neustrelitz building site.

The new training facility in Halle Ammendorf is founded and established.

The German Projects team builds the northern integration for City Tunnel Leipzig.

2014

First in-house exhibition of DB Bahnbau Gruppe GmbH at the Augsburg site.

The organizational unit Underground cable installation/Third rail is founded and established.

2015

The second organizational unit Bridge workshop in Grünsfeld is founded.

2016

Telekommunikation

The organizational unit Telecommunications is founded and established.

German Projects team builds the Dresdener Straße railroad overpass in Frankfurt/Oder. 

2017

Gleislabor Logo

The Dresden bridge workshop celebrates its 90th anniversary.

The Gleislabor Lab, the ideasmith of DB Bahnbau Gruppe GmbH, is brought to life.

The Prime Contractor Projects service unit is involved in two large-scale projects in Israel, and renews and builds new ballasted tracks.

2018

viele Photovoltaikplatten mit Mitarbeiter, der diese montiert

The ICE depot Köln-Nippes is equipped with a state-of-the-art photovoltaic system by the Electromechanical engineering service unit.

2019

Viadukt Brücke Greeve

Foundation of the Bridge building organizational unit based in Hamm.

2020

German Projects team builds large-scale projects “Magdeburg hub”, “Horka-Niesky” route, and “Niesky-Lohsa” route.

DB Bahnbau Gruppe GmbH is 10 years old

2021

Bagger schaufelt Erde auf einen grünen Laster

The corporate start-ups Erdpool & Encore are founded. 

The Göttingen-Kassel construction section of the 1733 high-speed line will be renewed.

2022

Innenaufnahme des ICE Werk Rummelsburg

The large-scaled project Wendlingen-Ulm was completed and the line was put into operation.

Expansion of the ICE factory in Rummelsburg by the equipment service unit.

Fahrbahn Mitte supports the expansion of the S6 line in Frankfurt am Main. 

2023

Einbau neuer Gleise

The DB Bahnbau Gruppe achieves a total output of over 1 billion euros for the first time.

Fahrbahn West builds in cooperation with GU-Projekte on the large-scaled project Oberhausen-Emmerich (upgraded line 46/2).

The cooperation agreement with DB Engineering & Consulting on the 360° Multisensor Platform is signed.