For maximum efficiency.

Article: For maximum efficiency.

Alongside technical expertise, market insight, and the commitment of employees trained to the highest levels, DB Bahnbau Gruppe Gmbh has a state-of-the-art pool of machines for installing the overhead line. ​

Overhead-line installation vehicles of DB Bahnbau Gruppe GmbH:​

  • MTW 100 overhead-line maintenance vehicle​
  • Overhead-line installation vehicle (OMF)​
  • Overhead-line installation wagon (FMW)​
  • Overhead-line construction wagon (OBW)​
  • 4 AXE road/rail work platform​
  • Rail-road truck/overhead-line installation vehicle​
  • Foundation machines/pile driver/drill
  of
End of the slider